29 April 2012

Exciting News!


Hello! How's life? Everything is well here. Mangoes are in season so I have been eating ridiculous amounts. Ghana has two-ish types of mango: the foreign and the local. That's what James calls them anyway. The "foreign" type are the big orangish-red colored ones, just like what you can buy in Kroger or Shop Rite or whatever. The "local" type are little bright yellow guys, about the size of baseball, which are much juicier and more fibrous than the foreign type. I'm talking like a 5 minute flossing session after you eat one.

ANYWAY!!! This post is definitely not about mangoes, so on to the good part!

Do you remember back in January, I wrote a post discussing my various goals for my Peace Corps service? Well I have some very exciting news! We're about to see two check marks on that list.

The grant proposal I wrote for the construction of new school building, which is to house both computer and science laboratories for Menji Agric Senior School.... WAS APPROVED! I applied for a Peace Corps / USAID grant called a SPA (Small Projects Assistance) Grant. There was a fair amount of paperwork to be done, but overall the process was really pretty simple! I guess rather than explaining the whole thing, I will just show you the proposal. So here it is!!






CONSTRUCTION OF THE MENJI AGRICULTURAL SENIOR SCHOOL SCIENCE AND ICT LABORATORIES
SPA GRANT PROPOSAL

PCV Betsy Ann Conway
Site Menji, Brong Ahafo
Counterpart James Kwadwo Tannor / 0209181534
Headmistress Jacintha Guribie / 0242168277


I. Project Summary
Located in rural western Brong Ahafo, Menji Agricultural Senior School (MASS) is home to a student body of 172. MASS offers two tracks of study: general arts and agriculture. Currently, every student in the school studies both integrated science and ICT. However, due to limited funding, the school has never been able to provide laboratory facilities for ICT or science. The students are currently studying ICT, biology, physics, and chemistry on a blackboard without any form of practical component. This project would greatly enhance the quality of education and academic experience at MASS.

II. Background Information
Located within the Tain District, the town of Menji is home to approximately 3,000 residents, most of whom are subsistence farmers. There are a few small businesses in the town, including a chemical seller, pharmacy, and a maternity clinic. Menji is about 10km from the Tain District capital, Nsawkaw, and about two hours from the regional capital of Sunyani. MASS has 172 students: 104 boys and 68 girls. The school offers two tracks of study: General Arts and Agriculture. Electricity is provided by the national grid. Water is supplied by nearby borehole.

III. Statement of Need
MASS is contained within a two-part building. The south building was constructed in 1992 and currently houses the Form 4 students, as well as the administrative block and the library. The north building is newer and currently houses the form 1, 2, and 3 students. The buildings are simple and bare, but safe and functional. The students are currently studying ICT, biology, physics, and chemistry in their regular classrooms on a chalkboard. The school is currently unable to offer any form of practical component in any subject.
The former head master, Adu Afram, identified the immediate need for improved facilities. The new and current headmistress, Jacintha Guribie, agrees with Afram's call for improvement. Without a science or ICT laboratory, compared to other nearby senior schools, M.A.S.S. is greatly lacking in terms of facilities. More importantly, without these laboratories in which to conduct practicals, the students' education is severely lacking.
Along with improvement of school facilities, the quality of education and thus enrollment would also increase. Furthermore, in addition to creating a better environment for students to learn, but this project would also make MASS a better place for teachers to teach.
IV. Objective
The school has identified the following specific objectives:
1. Primary Objective
  1. Construct an addition to the school to house science and ICT laboratories
  2. Create a proper environment for conducting practicals in the subjects of science and ICT
2. Secondary Objective
  1. Create a stimulating, interactive learning environment for students
  2. Improve teaching conditions by providing practical teaching facilities

V. Methods
After a meeting involving the school administration, the PTA, and the community education committee to review the project budget and time frame, the project can begin. First, the masons and laborers will work to construct the foundation and walls. Then, the carpenter may construct the roof and install the doors and windows. Then, the mason will lay tile in the ICT lab, as the electrician installs the electrical and lighting fixtures. The carpenter will also begin construction of new tables and chairs. Once all construction has finished, school staff and students will clean and paint laboratories. Finally, the school staff and students, will move the tables, chairs, and the rest of the equipment into the laboratories and perform a final cleaning.
The ICT teacher (PCV counterpart) will install the computers and accessory equipment in the ICT lab, while the PCV and other teachers organize the science lab.

VI. Action plan
No. Task Needed Materials Responsible Persons Estimated Timetable
1 Meet with PTA None PTA April 2012
2 Meet with Community Education Committee None Community Education Committee April 2012
3 Construct foundation Blocks, cement, sand Mason, laborers April 2012
4 Construct walls, ceiling, and roof Blocks, cement, sand, metal sheets, wood, nails, basic tools Mason, laborers, carpenter May 2012
5 Installation of doors and windows Wood, nails, hinges, locks, louvers, basic tools Carpenter May 2012
6 Install electrical wiring and lighting fixtures Wires, fixtures, light bulbs, basic tools Electrician May 2012
7 Lay tile in ICT lab Tile, mortar Mason (s) May 2012
8 Build tables and chairs Wood, nails, basic tools Carpenter June 2012
9 Clean and paint the laboratories Paint, turpentine, brushes PCV, teachers, and students June 2012
10 Final cleaning and installation of equipment Basic cleaning supplies PCV, teachers & students June 2012

VII. Budget
The project budget was prepared in Ghana Cedis (GH₵). All the final totals have been converted to US Dollars (US$) using a conversion rate of GH1.68 = US$1.00.

VIII. Requested Funds
Item Quantity Unit Cost (GH₵) Total Cost (GH₵) Total Cost (US$)
Roofing Sheets 8 packs 250 2000 1190.48
Roofing Nails 10 boxes 20 200 119.05
Felt 4 pieces 2 8 4.76
1/4 Rod 6 pieces 3 18 10.71
Nails, 4" 3 boxes 30 90 53.57
Nails, 3" 1 box 30 30 17.86
Nails, 2 1/2" 1 box 40 40 23.81
Nails, 1 1/2" 1 box 40 40 23.81
Plywood, 1/8" 60 pieces 13 780 464.29
Ceiling Buttons 15 pieces 5.5 82.5 49.11
Window Frames, 3-in-1 2 pieces 30 60 35.71
Double Door Frames 2 pieces 30 60 35.71
Louvre Frames, 8 blade 12 pieces 9 108 64.29
Louvre Blades 3 packs 41 123 73.21
Netting 1 pack 25 25 14.88
Burglar Proofing 4 pieces 70 280 166.67
Wood, 1x9 20 pieces 13 260 154.76
Wood, 2x2 40 pieces 4 120 71.43
Wood, 2x3 60 pieces 5 300 178.57
Wood, 2x4 100 pieces 6 600 357.14
PVC Pipes 15 pieces 1.5 22.5 13.39
Conduct Boxes, 3x3 7 pieces 1 7 4.17
Conduct Boxes, 3x6 10 pieces 1.5 15 8.93
Circuit Breaker 1 pieces 150 150 89.29
Circuit Boxes 5 pieces 1 5 2.98
Cable, 10m 1 piece 150 150 89.29
Insulated Cable, 1.5 3 rolls 34 102 60.71
Insulated Cable, 2.5 3 rolls 52 156 92.86
Gavy Switch, 1 3 pieces 5 15 8.93
Gavy Switch, 3 2 pieces 6 12 7.14
13-Amp Socket, 3x6 10 pieces 8 80 47.62
13-Amp Socket, 3x3 3 pieces 6 18 10.71
Earthrod 1 pieces 8 8 4.76
Ceiling Rose 5 pieces 1.5 7.5 4.46
Lamp Holders 5 pieces 1.5 7.5 4.46
Batting Fitting 4 pieces 1.5 6 3.57
Flexible Rose 4 pieces 1.5 6 3.57
Energy-Saving 5 pieces 0.5 2.5 1.49
Total



5994.5 3568.15

Requested Funds are 71.9% of the total project cost.

IX. Community contribution
Item Quantity Unit Cost (GH₵) Total Cost (GH₵) Total Cost (US$)
Cement Blocks 500 pieces 0.7 350 208.33
Sand 2 trips 120 240 142.86
Gravel 1 trip 100 100 59.52
Cement Bags 20 pieces 23 460 273.81
Iron Rods 12 pieces 15 180 107.14
Wood, Beam Boards 6 pieces 10 60 35.71
Workmanship, Electrical 1 unit 200 200 119.05
Workmanship, Carpentry 1 unit 300 300 178.57
Workmanship, Masonry 1 unit 300 300 178.57
Transportation of Materials

150 150 89.29
Total



2340 1392.86

Community Contribution is 28.1% of the total project cost

X. Monitoring and Evaluation
Photos will be taken before and after construction. They will clearly depict the project through all stages of the action plan. Also, students, teachers, PTA, and community members will be interviewed regarding their thoughts on the project. Receipts will be collected as record of funds spent and materials purchased.

XI. Supporting Data
A step-by-step photographic slide show of the construction will be submitted with the completion report. Testimonials from students and teachers will be included regarding how the construction has improved the quality of education at MASS.








So that's it people!  They've bought the sand and concrete for the foundation so far.  I will take plenty of pictures and keep you updated along the way. :)